Upstairs furnace room
|
Furnace Room before |
After demolition |
|
|
|
|
Removal of plaster before cutting hole in wall for NE bedroom closet |
Closet framed out |
|
|
|
| Closet drywalled | Finished - NE bedroom closet from inside furnace room |
![]() |
![]() |
![]()
Same closet space from inside the North East bedroom:
| Closet opening marked off | Closet framed out |
![]() |
![]() |
Back of closet framing drywalled
![]()
Ceiling at point of future furnace duct work:
| Hole created | Hole drywalled |
![]() |
![]() |
Hole trimmed and painted.

Next, the furnace will go in.

![]()
Floor:
Before

| Concrete board | With waterproof paint and border |
![]() |
![]() |